This guide will cover:
Information 
This report shows asset information that is stored in the Asset Management system to help end-users view assets assigned to their department and where they are located. This report is used by Asset Management during the two-year rolling inventory review process. If a department needs to dispose of an asset, the information in this report can aid in completing the Property Disposal Request (PDR) form.
 
Navigating to the Report

	- Once you have located the Table of Contents, click on the Asset Inventory Report located under the Other Financial Reports heading.
Interpreting and Understanding the Report
	- The report can be ran with no parameters, or users can narrow down to their Organization code.
 
	- The following columns are included in the report:
	
		
			| Column Name | Column Description | 
		
			| Tag Number | Number assigned by Asset Management to tag the item | 
		
			| Asset Description | Description of the asset to identify what the item is | 
		
			| Asset Manufacturer | Manufacturer, if available, of the type of asset | 
		
			| Asset Model | Model name or number of the asset if available | 
		
			| Serial Number | Serial number of the asset if available | 
		
			| Date Placed in Service | The date the asset was placed in service/received | 
		
			| Original Cost | The original cost of the asset (what was paid) | 
		
			| Location Concatenated Segment | Location of the asset including various segments that have been concatenated together | 
		
			| Employee Name | Employee name that is responsible for the asset | 
		
			| Asset Key | Field used in Asset Management to determine the source of the asset (i.e., UWYO funding, Athletics, Federal, State, PPM, None) | 
		
			| Physical Inventory Date | Date when the item was last physically tracked and audited for inventory | 
		
			| Asset Number | The asset number assigned by the system for asset management | 
		
			| Project ID 1 | Project number if project funding was used to obtain the asset | 
		
			| Project ID 2 | Second project number if the asset was split between project funds | 
		
			| Organization | Organization code the asset belongs to | 
	
 
Tips for Using this Report
	- 
	This report can be used to view any new assets assigned to each department to ensure transfers are completed by following the Capital Asset Business Process Guide. 
- 
	Departments can also use this to see if any other department on campus has a particular piece of equipment/item that they may be able to use/rent from the department instead of purchasing another item. 
- 
	For more information regarding the Asset Process, please visit the Asset Management Website or contact them by sending an email to property@uwyo.edu