Body
This guide will cover:
Information
Scheduling a report allows a user to have a report on the Transactional Reporting Table of Contents delivered to their email inbox or select other locations on a regular basis. This guide will explain how to set up automating a report. For reports under "Business Intelligence and Data Visualizations" and "Executive Leadership" please visit Microsoft Power BI for scheduling PowerBI Reports.
Step One
- Navigate to WyoCloud and click on the Reporting Table of Contents tile.
Step Two
- Locate and open the report that you wish to schedule from the Transactional Reporting Table of Contents dashboard.
Step Three
Step Four
-
The prompts in the “General” tab will be the same prompts that are within the report you have selected.
-
Input the information that you would like to see in your scheduled reports into the parameter fields.
|
The fields in the general section will change depending on the report that you are scheduling. In this example, we are using the Payroll Expenditures without Fringe Report.
|
Step Five
-
After filling out the “General” tab, click on the “Output” tab located directly to the right.
-
In the “Output” tab, specify the following prompts:
-
Name - Name of report.
-
Layout - The only option is Details
-
Format - Format of report such as Excel
-
Locale - Language of recipient of report
-
Time zone - Time zone that the report will be sent according to
-
Calendar - Type of calendar that the report will be sent according to
-
Save Output - Whether the output of the report will be saved
-
Next, click on add destination. The destination is where the report will be sent to. Multiple destinations can be added as needed.
-
Make sure to fill out the starred fields, as well as any other information such as a subject line.
Step Six
-
After filling out the “Output” tab, click on the “Schedule” tab located directly to theright.
-
The “Schedule” tab allows you to specify your schedule time or schedule.
-
There are 7 frequency options: Once, Hourly/Minute, Daily, Weekly, Monthly, Annually and Specific Dates. Select and fill out all fields of the one that best suits your needs.
-
The Start and End fields specify the time period that the report will be automatically sent.
-
No triggers available
Step Seven (Optional)
-
After filling out the “Schedule” tab, click on the “Notification” tab located directly to the right.
-
The “Notification” tab allows you to elect to receive notifications about the report.
-
This section is not required to be filled out.
- If you choose to fill out the "Notification" tab, be sure to input your email address and check any of the four boxes under the "When" subheading that you might need.
- The "Report completed" box will notify you when the report is completed.
- The "Report completed with warnings" box will notify you when the report has been completed but there are warnings within it.
- The "Report failed" box will notfiy you when your report has failed.
- The "Report skipped" box will notify you if your report has been skipped.
|
Note: You only need to check he boxes you need regarding notifications. You do not need to select all of them, but may if you so choose.
|
Step Eight
Step Nine (Optional)
-
Once on the “Jobs” page, filter by Report Job Name, Owner, etc. to find the report you want to remove from scheduled reports.
-
Report Job Name - Defined Name of Report Job
-
Report Name - Pathway Name of Report Selected
-
Status - Status of Report Job (All, Active, or Paused)
-
Start Time - Defined Start Time of Report Job
-
End Time - Defined End Time of Report Job
-
Owner - Owner of Report Job
-
Scope - Scope of Report Job (All, Private, or Public)
-
Once you find the report you want to remove, select the report, then click on the “X” icon.
.
This completes all the Scheduling a Report from the Table of Contents Automatically processes.